Projects
Resources & Ore Reserves

The global Mineral Resource for the Lady Annie Project is 40Mt at 0.9% Cu for 358,700 tonnes of contained copper (Table 1).  The Ore Reserve contains 142,200 tonnes of copper metal (Table 2), which is a 25% increase on the Ore Reserve that the Feasibility study was based on. Re-optimisation of the newly defined resources discovered during 2007 will be completed in early 2008 to update the Ore Reserve.

Table 1: Copper Mineral Resource Estimate for Lady Annie Operations December 2007

Using a 0.3% Cu lower  cut off for Lady Annie and a 0.2% Cu lower cut off for the Mount Kelly ore bodies.

CopperCo Limited – Mineral Resource Statement as at December 2007

Deposit

Measured

Indicated

Inferred

Total Mineral Resource

 

Tonnes

Cu %

Tonnes

Cu %

Tonnes

Cu %

Tonnes

Cu %

Cu Tonnes

Oxide Resources

 

 

 

 

 

 

 

 

 

Lady Annie

6,994,000

1.2

2,407,000

0.9

1,710,000

0.8

11,111,000

1.1

120,900

Lady Brenda

-

-

-

-

1,126,000

0.5

1,126,000

0.5

5,400

Mount Clarke

2,501,000

0.9

3,688,000

0.7

154,000

0.6

6,343,000

0.7

51,100

Flying Horse

1,198,000

0.7

3,044,000

0.6

885,000

0.7

5,127,000

0.6

33,100

Mount Kelly Workings

-

-

129,000

0.7

83,000

0.6

212,000

0.7

1,400

Swagman

128,000

0.6

170,000

0.6

61,000

0.5

359,000

0.6

2,100

Anthill

-

-

1,055,000

1.0

1,910,000

1.2

2,965,000

1.1

33,300

Oxide Sub-Total

10,821,000

1.1

10,493,000

0.7

5,929,000

0.8

27,243,000

0.9

247,300

Sulphide Resources

 

 

 

 

 

 

 

 

 

Lady Annie

4,905,000

0.8

2,483,000

0.9

1,556,000

0.8

8,944,000

0.9

77,700

Lady Brenda

-

-

-

-

763,000

0.7

763,000

0.7

5,100

Flying Horse

220,000

0.5

638,000

1.1

1,217,000

0.9

2,075,000

0.9

18,700

Anthill

-

-

-

-

935,000

1.1

935,000

1.1

9,900

Sulphide Sub-Total

5,125,000

0.8

3,121,000

0.9

4,471,000

0.9

12,717,000

0.9

111,400

TOTAL RESOURCE

15,946,000

1.0

13,614,000

0.8

10,400,000

0.9

39,960,000

0.9

358,700

Note: Figures used are rounded

Table 2: Lady Annie Operations Ore Reserve Statement January 2007

CopperCo Limited – Ore Reserve Statement as at January 2007

Deposit

Proved

Probable

Total Ore Reserve

 

Tonnes

Cu %

Tonnes

Cu %

Tonnes

Cu %

Cu Tonnes

Open Pit

 

 

 

 

 

 

 

Lady Annie

4,710,000

1.3

3,808,000

1.0

8,518,000

1.2

87,760

Mount Clarke

2,406,000

0.9

3,343,000

0.7

5,749,000

0.8

40,730

Flying Horse

968,000

0.8

773,000

0.7

1,741,000

0.8

11,660

Mount Kelly Workings

-

-

85,000

0.7

85,000

0.7

520

Swagman

131,000

0.6

143,000

0.6

274,000

0.6

1,490

TOTAL RESERVE

8,215,000

1.1

8,152,000

0.8

16,367,000

1.0

142,160

Note: Figures used are rounded

The Ore Reserve figures are based on the following assumptions.

  • 5% Mining Dilution
  • 98% Mining Recovery
  • 89% Metallurgical Recovery
  • Copper Price of US$2.20/lb